Skip to content
ISO 9001:2015 · Since 2017 Lahore · Karachi · Islamabad Open 24/7 – bookings and emergency dispatch

Rig Camp Relocation

Rig camp relocation by Talal Low Bed Trailer Services – complete rig camps – accommodation cabins, kitchens, offices, stores, water and fuel tanks and generators – moved and set up at the new location before the crew arrives.

Part of our rig transportation and logistics solutions for oil, gas and drilling companies across Pakistan.

On this page
  1. What our rig camp relocation include
  2. Typical loads
  3. Trailers and cranes we use
  4. How it works
  5. Where we work
  6. Safety
  7. What we need for a quote
  8. Rig camp relocation – planning a heavy move
  9. What decides the cost
  10. More rig transportation services
  11. Rig camp relocation – FAQs
Rig camp relocation

For a quote, call us or send the load details on WhatsApp – weight, size, pickup and delivery points and your date – or use the heavy transport quote form. We reply within minutes, day and night.

What our rig camp relocation include

  • Cabin moves – accommodation, kitchen, mess, office and medical cabins
  • Utilities – generators, water tanks, fuel tanks and sewage units
  • Crane setting – cabins placed on level ground in the camp layout
  • Timing – camp moved first so the crew is housed when the rig arrives

With rig camp relocation, one coordinator handles the trailer, crane, permits and escorts for you.

Typical loads

  • Accommodation and kitchen cabins
  • Offices, stores and workshops
  • Water and fuel tanks
  • Camp generators
  • Containers and furniture

Customers choose our rig camp relocation for clear quotes, trained crews and on-time delivery.

Trailers and cranes we use

Trailer / equipment Capacity Best for
Flatbed Trailer 25–40 tons steel, pipes, girders, panels and machinery parts
Container Trailer (20 / 40 ft) 20–30 tons import and export containers between ports, dry ports and factories
Lowbed Trailer 30–60 tons (2 to 4 axles) excavators, loaders, generators, transformers and tall machinery
Mobile Crane 25–200+ tons loading, unloading and setting machinery, containers and structures

Every rig camp relocation job is planned with a route survey and a written move plan.

How it works

  1. Load list and survey – rig load list, both locations, access roads, bridges and ground conditions.
  2. Move plan – trailers per load, cranes, crew, permits, escorts and a day-by-day schedule.
  3. Rig down – components dismantled, tagged and staged for loading.
  4. Loading and convoy – loads chained and blocked; convoys run at fixed speeds with pilot vehicles.
  5. Offloading in sequence – loads placed where the rig-up plan needs them.
  6. Rig up and handover – rig reassembled with your crew, ready to spud.

Booking rig camp relocation takes one call or WhatsApp message with the weight, size and both locations.

Where we work

Safety

  • Job safety plan and toolbox talk before rig down, loading and every convoy
  • Rigging checked before each lift; tag lines and a banksman for crane work
  • Loads chained and blocked, with flags and lights on over-size loads
  • Fixed convoy speeds, rest points and no movement in unsafe weather or light
  • PPE for every crew member; your HSE rules and permit-to-work followed on site

Over-size loads move under National Highway Authority and provincial permits with pilot vehicles.

What we need for a quote

  • Rig type and capacity, and the load list (number of loads, heaviest and largest load)
  • Old and new site locations (coordinates or nearest town) and the distance
  • Condition of the access roads to both sites
  • Rig down date and target spud date
  • Whether rig crew, cranes and camp moves are needed from us

Rig camp relocation – planning a heavy move

Book early for project cargo. Permits, escorts and crane availability take time, and the best trailers are booked days ahead around month-end and before Eid.

Start with the exact weight and dimensions of the load from the drawing or packing list – length, width, height and centre of gravity. A few centimetres of height decide whether a lowbed or a semi lowbed is needed.

Check access at both ends: gate width, turning space, overhead lines and whether the ground can take a crane and a loaded trailer. Many delays happen inside the factory or site, not on the highway.

What decides the cost

Permits, escorts, night movement and standby time at site are added only when the job needs them – every quote lists them clearly.

Flexible dates and return loads can bring the price down. Monthly and project contracts get fixed rates.

The main factors are the weight and size of the load, the trailer and number of axles, the distance and road conditions, and crane work at both ends.

More rig transportation services

Rig camp relocation – FAQs

How many cabins can one trailer take?

Usually one large cabin or two small ones per flatbed, depending on size and weight.

Do you place the cabins at the new site?

Yes, with a crane according to your camp layout.

Which areas do you cover?

Sindh, Khyber Pakhtunkhwa, Punjab (Potohar), Balochistan and Karachi port.

Do you arrange permits and escorts?

Yes, for over-size and over-weight loads on the route.

How do I book?

Send the load list and both locations on WhatsApp or call 0301 8416275.

Heavy load to move?

Send the weight, size and both locations – get the right trailer and a written price.

Call WhatsApp Quote