Specialized Rig Transportation and Logistics Solutions

Rig transportation and logistics by Talal Low Bed Trailer Services – specialized solutions for oil, gas and industrial drilling rigs: rig down and rig up, heavy haulage on lowbed, semi lowbed, multi axle and flatbed trailers, cranes, camp moves, pipe and oilfield equipment, with route surveys, permits and escorts across Pakistan.

One team plans and runs the whole move, so your rig reaches the new location on schedule and is ready to spud.

On this page
  1. Our rig transportation services
  2. What a rig move includes
  3. Trailers and cranes for rig moves
  4. How a rig move works
  5. Rig moving across Pakistan's oil and gas regions
  6. Safety on every rig move
  7. Our heavy transport work
  8. What we need to plan your rig move
  9. Rig transportation and logistics – what decides the cost
  10. Permits, axle loads and escorts
  11. Rig transportation and logistics – FAQs
Rig transportation and logistics in Pakistan

For a quote, call us or send the load details on WhatsApp – weight, size, pickup and delivery points and your date – or use the heavy transport quote form. We reply within minutes, day and night.

Our rig transportation services

Ask for rig transportation and logistics early around month-end and Eid, when demand for heavy trailers is highest.

What a rig move includes

  • Rig down and rig up crews working with your drilling team
  • Heavy haulage – lowbeds, semi lowbeds, multi axle and flatbed trailers with prime movers
  • Lifting – mobile and crawler cranes at both sites
  • Route survey – bridges, culverts, bends, gradients, wires and soft ground
  • Permits and escorts – National Highway Authority and provincial permits, pilot vehicles and check-post clearances
  • Camp, pipe and support moves – cabins, tanks, generators, pipe and stores

Our rig transportation and logistics team checks the load details first, so the right trailer reaches you the first time.

Trailers and cranes for rig moves

Trailer / equipment Capacity Best for
Lowbed Trailer 30–60 tons (2 to 4 axles) excavators, loaders, generators, transformers and tall machinery
Semi Lowbed (Samibed) Trailer 30–50 tons medium machinery, construction equipment, rig loads and factory machines
Multi Axle Trailer 60–150+ tons (4 to 8 axles) transformers, turbines, boilers, rig loads and indivisible heavy loads
Detachable Gooseneck (RGN) Trailer 30–80 tons excavators, bulldozers, cranes and other machines that drive on
Flatbed Trailer 25–40 tons steel, pipes, girders, panels and machinery parts
Extendable Trailer 20–60 tons wind turbine blades, long girders, poles and pipes
Prime Mover pulls 40–150+ tons pulling lowbed, multi axle and modular trailers
Mobile Crane 25–200+ tons loading, unloading and setting machinery, containers and structures
Crawler Crane 100–500+ tons power plant erection, bridges, wind turbines and heavy lifts on site

With rig transportation and logistics, one coordinator handles the trailer, crane, permits and escorts for you.

How a rig move works

  1. Load list and survey – rig load list, both locations, access roads, bridges and ground conditions.
  2. Move plan – trailers per load, cranes, crew, permits, escorts and a day-by-day schedule.
  3. Rig down – components dismantled, tagged and staged for loading.
  4. Loading and convoy – loads chained and blocked; convoys run at fixed speeds with pilot vehicles.
  5. Offloading in sequence – loads placed where the rig-up plan needs them.
  6. Rig up and handover – rig reassembled with your crew, ready to spud.

Customers choose our rig transportation and logistics for clear quotes, trained crews and on-time delivery.

Rig moving across Pakistan's oil and gas regions

Each region has its own roads, terrain and rules, so the move plan is made for that area:

Oil and gas activity in Pakistan is regulated by OGRA and the provincial authorities; operators set the HSE standards our crews follow on site.

Every rig transportation and logistics job is planned with a route survey and a written move plan.

Safety on every rig move

  • Job safety plan and toolbox talk before rig down, loading and every convoy
  • Rigging checked before each lift; tag lines and a banksman for crane work
  • Loads chained and blocked, with flags and lights on over-size loads
  • Fixed convoy speeds, rest points and no movement in unsafe weather or light
  • PPE for every crew member; your HSE rules and permit-to-work followed on site

Booking rig transportation and logistics takes one call or WhatsApp message with the weight, size and both locations.

Our heavy transport work

Multi axle trailer convoy – heavy transport
Industrial machinery convoy on lowbed trailers
Boiler transport on a lowbed trailer

Trusted on projects such as Dasu Dam, the Peshawar BRT and power plant relocations – see our clients and projects.

We provide rig transportation and logistics day and night, including Sundays and public holidays.

What we need to plan your rig move

  • Rig type and capacity, and the load list (number of loads, heaviest and largest load)
  • Old and new site locations (coordinates or nearest town) and the distance
  • Condition of the access roads to both sites
  • Rig down date and target spud date
  • Whether rig crew, cranes and camp moves are needed from us

Rig transportation and logistics – what decides the cost

Permits, escorts, night movement and standby time at site are added only when the job needs them – every quote lists them clearly.

Flexible dates and return loads can bring the price down. Monthly and project contracts get fixed rates.

The main factors are the weight and size of the load, the trailer and number of axles, the distance and road conditions, and crane work at both ends.

Permits, axle loads and escorts

Pakistan’s motorways and highways have axle-load limits set by the National Highway Authority, and provincial highways and city roads have their own rules. Heavy and over-size loads need a permit and often a fixed route.

Wide and tall loads move with pilot vehicles and flags, usually at night or outside peak hours in big cities. Toll plaza widths, bridges and culverts are checked during the route survey.

Using enough axles keeps every axle within the legal limit – that is why very heavy loads go on multi axle or modular trailers instead of a standard lowbed.

Rig transportation and logistics – FAQs

Do you move complete drilling rigs?

Yes – land drilling and workover rigs, from rig down to rig up, with trailers, cranes and crews.

Which areas do you cover?

All oil and gas regions – Sindh, Khyber Pakhtunkhwa, Punjab (Potohar) and Balochistan – plus Karachi port.

Can you handle the camp and pipe as well?

Yes, rig camps, pipe and casing, tanks and generators are part of the same move plan.

Do you follow our HSE system?

Yes, our crews follow the operator's HSE rules and permit-to-work on site.

How do I get a rig move quote?

Send the rig load list and both locations on WhatsApp or call 0301 8416275.